Week 3: footings and anchor bolts

Week 14: steel columns and roof trusses

Week 38: handover with eight loading docks
Apodaca logistics warehouse
Industrial
- Floor area
- 12,400 m²
- Handover
- 2025
- Build time
- 9 months
- Client
- Grupo Logístico del Norte

Builders in Monterrey since 1998. Warehouses, offices and homes with the handover date signed into the contract.
Estimate my buildThree of the buildings we handed over last year, with photos from their weekly site log.

Week 3: footings and anchor bolts

Week 14: steel columns and roof trusses

Week 38: handover with eight loading docks
Industrial

Month 4: slabs poured up to level four

Month 11: glass facade going in

Month 16: six office floors finished
Commercial

Month 2: block walls and slab formwork

Month 4: pouring the roof slab

Month 11: finished, with its stone wall
Residential
From the soil study to the keys, under one contract and one site manager.


Offices, shops and plazas. Concrete structure, facades, services and finishes; we coordinate every subcontractor for you.

Steel structure, heavy-duty industrial floor, loading docks and yard. Handed over with as-built drawings.

On your lot, with your architect or ours. You choose the finishes and we keep the budget line by line.

Shops, offices and homes in use. We work in stages and at night so your business stays open.
Five stages, each with a date in the contract. Every Friday you get the site log with photos.
Survey, soil study and a check of what zoning allows on your lot.
1 to 2 weeks

Drawings, structural design and a line-by-line budget, adjusted until you approve it.
3 to 5 weeks

We file the building permit, alignment and street number with the city.
2 to 6 weeks

A full-time site manager, a weekly photo log and progress billing every two weeks.
Depends on the project

A walkthrough with you, a punch list, as-built drawings and the written warranty.
1 week

Price with materials and labour. The final number comes from a free site visit.
Estimated cost: $2,600,000. Estimated time: 7 months.
$2,600,000
Estimated cost · $13,000 per m² · 7 months
Written warranty: 5 years on structure, 2 on services and 1 on finishes.
Book a site visit
“They handed over the warehouse in week 38, as the contract said. With the Friday site log we never had to visit the site.”
Six to eight months from foundations to handover. The date goes into the contract with a penalty for every week of delay.
Yes. Building permit, zoning, alignment and street number; when needed, the traffic and environmental impact studies too.
Five years on structure, two on electrical and plumbing and one on finishes. The first year of preventive maintenance is included.
20% down on signing, progress payments every two weeks based on the work you see in the site log, and 10% at handover.
We sign a change order with the new scope, time and cost before any extra work starts. No surprises at the end.


Carretera Miguel Alemán km 14
Apodaca, Nuevo León